Shipping in France

Get up-to-date local information about export procedures and restrictions, demurrage and detention, container drop-offs and more.

Demurrage / Detention

Demurrage and Detention - 2019

Free time:         Calendar day basis (i.e. including week-ends and holidays)
Currency:          Euro
Invoiced:           Per container, per day, as per container type

Demurrage export

Demurrage starts from gate-in day (included) on the terminal, ends with loading day (included) to vessel.

Free time:

Type DRY Flat & Open top REEF IMO
Days 7 7 3 4

Note 1: demurrage are INCLUDING terminal storage costs
Note 2: demurrage for reefer are INCLUDING the plugging fees on terminal

Tariff:

Days after free time expiration 20’ DRY 40’ / 40’hc 45’ DRY Flat & Open top 20’ REEF 40’ REEF Shipper’s owned
4th to 6th day 105 105
As from 7th day 175 175
8th to 12th day 45 70 150 20
13th to 17th day 75 105 250 60
As from 18th day 115 165 250 100

 

Days after free time expiration 20’ IMO 40’, 45’ IMO
5th to 8th Day 85 eur 95 eur
As from day 9 120 eur 130 eur

 

Detention export

Detention starts the day after the empty pick up day (included), ends with gate-in day (included) in terminal.

Free time:

Type DRY Flat & Open top REEF IMO
Days 7 7 5 7

 

Tariff:

Days after free time expiration 20’ DRY 40’ / 40’hc 45’ DRY Flat & Open top 20’ REEF 40’ REEF IMO Shipper’s owned
6thto 7thday 75 75 As per dry container
8thto 14thday 35 45 150 150 150
As from 15thday 70 90 200 200 200

Email your local office

If you want to speak to a sales person about a new shipment or have a question about your existing shipment, you can email us. If you have a more immediate question, you can search for help online or contact us by phone