Shipping to and from United Kingdom
Find all you need to ship to and from United Kingdom. Find the right route, Sealand’s office locations, discover local solutions, payment options and more.
Export
Area : United Kingdom & Ireland Area
Country : United Kingdom (GB)
Direction : Export
Effective Date : 01/11/2021
Expiry Date : Until further notice
Free time : Calendar day
Currency : GBP
Invoiced : Per container, per calendar day, per container size type
SPOT terms are those accepted at the time the booking is confirmed and are not necessarily aligned with the standard tariff.
Export Detention
Equipment detention commences on and includes the day that the empty container is collected and ends on the day that the full container is gated-in at the first load port.
All UK ports including Belfast
Days | 20’ DRY | 40’ DRY 40’ HC & 45’ DRY | 20’ Flat & Open top | 40’ Flat & Open top | 20’ REEF / 40’ REEF |
---|---|---|---|---|---|
Days
1 to 7
|
20’ DRY
Free
|
40’ DRY 40’ HC & 45’ DRY
Free
|
20’ Flat & Open top
Free
|
40’ Flat & Open top
Free
|
20’ REEF / 40’ REEF
Free / Free
|
Days
8 to 14
|
20’ DRY
15
|
40’ DRY 40’ HC & 45’ DRY
24
|
20’ Flat & Open top
35
|
40’ Flat & Open top
56
|
20’ REEF / 40’ REEF
65 / 74
|
Days
15 onwards
|
20’ DRY
25
|
40’ DRY 40’ HC & 45’ DRY
40
|
20’ Flat & Open top
45
|
40’ Flat & Open top
72
|
20’ REEF / 40’ REEF
75 / 90
|
- Non-operating reefer (NOR) will be charged as REEFER equipment
- Shippers’ own containers (SOC) will not be subject to equipment detention charges
- The free time & charges applied will be those in place on the origin price calculation date (PCD)
- Cancelled (frustrated) exports will be subject to detention charges without free time
Export Demurrage
Demurrage (including equipment & storage) commences on and includes the day that the full container is gated-in at the first load port and ends on the planned arrival day of the vessel on which the container is shipped. If the container is not loaded by the carrier as intended the demurrage period will end on the planned arrival day of the vessel on which the container was booked to load.
Felixstowe
Days | 20’ DRY | 40’ DRY 40’ HC & 45’ DRY | 20’ Flat & Open top | 40’ Flat & Open top | 20’ REEF / 40’ REEF |
---|---|---|---|---|---|
Days
1 to 6
|
20’ DRY
Free
|
40’ DRY 40’ HC & 45’ DRY
Free
|
20’ Flat & Open top
Free
|
40’ Flat & Open top
Free
|
20’ REEF / 40’ REEF
Free / Free
|
Days
7 to 8
|
20’ DRY
Free
|
40’ DRY 40’ HC & 45’ DRY
Free
|
20’ Flat & Open top
Free
|
40’ Flat & Open top
Free
|
20’ REEF / 40’ REEF
35 / 35
|
Days
9 to 14
|
20’ DRY
18
|
40’ DRY 40’ HC & 45’ DRY
30
|
20’ Flat & Open top
18
|
40’ Flat & Open top
30
|
20’ REEF / 40’ REEF
53 / 65
|
Days
15 onwards
|
20’ DRY
27
|
40’ DRY 40’ HC & 45’ DRY
45
|
20’ Flat & Open top
27
|
40’ Flat & Open top
45
|
20’ REEF / 40’ REEF
62 / 80
|
Grangemouth
Days | 20’ DRY | 40’ DRY 40’ HC & 45’ DRY | 20’ Flat & Open top | 40’ Flat & Open top | 20’ REEF / 40’ REEF |
---|---|---|---|---|---|
Days
1 to 6
|
20’ DRY
Free
|
40’ DRY 40’ HC & 45’ DRY
Free
|
20’ Flat & Open top
Free
|
40’ Flat & Open top
Free
|
20’ REEF / 40’ REEF
Free / Free
|
Days
7 to 10
|
20’ DRY
Free
|
40’ DRY 40’ HC & 45’ DRY
Free
|
20’ Flat & Open top
Free
|
40’ Flat & Open top
Free
|
20’ REEF / 40’ REEF
45 / 45
|
Days
11 to 14
|
20’ DRY
15
|
40’ DRY 40’ HC & 45’ DRY
30
|
20’ Flat & Open top
15
|
40’ Flat & Open top
30
|
20’ REEF / 40’ REEF
60 / 75
|
Days
15 onwards
|
20’ DRY
20
|
40’ DRY 40’ HC & 45’ DRY
40
|
20’ Flat & Open top
20
|
40’ Flat & Open top
40
|
20’ REEF / 40’ REEF
65 / 85
|
Belfast
Days | 20’ DRY | 40’ DRY 40’ HC & 45’ DRY | 20’ Flat & Open top | 40’ Flat & Open top | 20’ REEF / 40’ REEF |
---|---|---|---|---|---|
Days
1 to 6
|
20’ DRY
Free
|
40’ DRY 40’ HC & 45’ DRY
Free
|
20’ Flat & Open top
Free
|
40’ Flat & Open top
Free
|
20’ REEF / 40’ REEF
Free / Free
|
Days
7 to 10
|
20’ DRY
Free
|
40’ DRY 40’ HC & 45’ DRY
Free
|
20’ Flat & Open top
Free
|
40’ Flat & Open top
Free
|
20’ REEF / 40’ REEF
65 / 65
|
Days
11 to 14
|
20’ DRY
30
|
40’ DRY 40’ HC & 45’ DRY
30
|
20’ Flat & Open top
30
|
40’ Flat & Open top
30
|
20’ REEF / 40’ REEF
95 / 95
|
Days
15 onwards
|
20’ DRY
60
|
40’ DRY 40’ HC & 45’ DRY
60
|
20’ Flat & Open top
60
|
40’ Flat & Open top
60
|
20’ REEF / 40’ REEF
125 / 125
|
All other UK ports
Days | 20’ DRY | 40’ DRY 40’ HC & 45’ DRY | 20’ Flat & Open top | 40’ Flat & Open top | 20’ REEF / 40’ REEF |
---|---|---|---|---|---|
Days
1 to 6
|
20’ DRY
Free
|
40’ DRY 40’ HC & 45’ DRY
Free
|
20’ Flat & Open top
Free
|
40’ Flat & Open top
Free
|
20’ REEF / 40’ REEF
Free / Free
|
Days
7 only
|
20’ DRY
Free
|
40’ DRY 40’ HC & 45’ DRY
Free
|
20’ Flat & Open top
Free
|
40’ Flat & Open top
Free
|
20’ REEF / 40’ REEF
55 / 55
|
Days
8 to 14
|
20’ DRY
24
|
40’ DRY 40’ HC & 45’ DRY
36
|
20’ Flat & Open top
24
|
40’ Flat & Open top
36
|
20’ REEF / 40’ REEF
79 / 91
|
Days
15 onwards
|
20’ DRY
36
|
40’ DRY 40’ HC & 45’ DRY
54
|
20’ Flat & Open top
36
|
40’ Flat & Open top
54
|
20’ REEF / 40’ REEF
91 / 109
|
Area : United Kingdom & Ireland Area
Country : United Kingdom (GB)
Direction : Export
Effective Date : 01/07/2021
Expiry Date : : 31/10/2021
Free time : Calendar day
Currency : GBP
Invoiced : Per container, per calendar day, per container size type
SPOT terms are those accepted at the time the booking is confirmed and are not necessarily aligned with the standard tariff.
Export Detention (all UK ports/terminals including Belfast)
Equipment detention commences on and includes the day that the empty container is collected and ends on the day that the full container is gated-in at the first load port.Days | 20' DRY | 40' / 40'hc / 45' DRY | 20' Flat & Open top | 40' Flat & Open top | 20’ REEF / 40’ REEF |
---|---|---|---|---|---|
Days
1 - 7
|
20' DRY
Free
|
40' / 40'hc / 45' DRY
Free
|
20' Flat & Open top
Free
|
40' Flat & Open top
Free
|
20’ REEF / 40’ REEF
Free/Free
|
Days
8 - 14
|
20' DRY
15
|
40' / 40'hc / 45' DRY
24
|
20' Flat & Open top
35
|
40' Flat & Open top
56 |
20’ REEF / 40’ REEF
45/72
|
Days
15 onward |
20' DRY
25 |
40' / 40'hc / 45' DRY
40 |
20' Flat & Open top
45
|
40' Flat & Open top
72 |
20’ REEF / 40’ REEF
65/104
|
- Non-operating reefer (NOR) will be charged as DRY equipment.
- Shippers’ own containers (SOC) will not be subject to equipment detention charges.
- The free time & charges applied will be those in place on the origin price calculation date (PCD).
- Cancelled (frustrated) exports will be subject to detention charges without free time.
Export Demurrage (all UK ports except Felixstowe & Belfast)
Demurrage (including equipment & storage) commences on and includes the day that the full container is gated-in at the first load port and ends on the planned arrival day of the vessel on which the container is shipped. If the container is not loaded by the carrier as intended the demurrage period will end on the planned arrival day of the vessel on which the container was booked to load.
Days | 20' DRY | 40' / 40'hc / 45' DRY | 20' Flat & Open top | 40' Flat & Open top | 20’ REEF / 40’ REEF |
---|---|---|---|---|---|
Days
1 - 6
|
20' DRY
Free
|
40' / 40'hc / 45' DRY
Free
|
20' Flat & Open top
Free
|
40' Flat & Open top
Free
|
20’ REEF / 40’ REEF
Free/Free
|
Days
7 - 8
|
20' DRY
Free
|
40' / 40'hc / 45' DRY
Free
|
20' Flat & Open top
Free
|
40' Flat & Open top
Free |
20’ REEF / 40’ REEF
40/40
|
Days
9 - 14 |
20' DRY
25 |
40' / 40'hc / 45' DRY
40 |
20' Flat & Open top
45
|
40' Flat & Open top
72 |
20’ REEF / 40’ REEF
65/80
|
Days
15 onwards
|
20' DRY
50 |
40' / 40'hc / 45' DRY
80
|
20' Flat & Open top
70 |
40' Flat & Open top
112 |
20’ REEF / 40’ REEF
90/120
|
- Non-operating reefer (NOR) will be charged as DRY equipment.
- Reefer demurrage includes plug-in/electricity charges.
- Shippers’ own containers (SOC) are subject to demurrage applicable to the equipment size/type.
- The free time & charges applied will be those in place on the origin price calculation date (PCD).
- Cancelled (frustrated) exports will be subject to demurrage charges without free time.
Export Demurrage (Felixstowe only)
Demurrage (including equipment & storage) commences on and includes the day that the full container is gated-in at the first load port and ends on the planned arrival day of the vessel on which the container is shipped. If the container is not loaded by the carrier as intended the demurrage period will end on the planned arrival day of the vessel on which the container was booked to load.
Days | 20' DRY | 40' / 40'hc / 45' DRY | 20' Flat & Open top | 40' Flat & Open top | 20’ REEF / 40’ REEF |
---|---|---|---|---|---|
Days
1 - 6
|
20' DRY
Free
|
40' / 40'hc / 45' DRY
Free
|
20' Flat & Open top
Free
|
40' Flat & Open top
Free
|
20’ REEF / 40’ REEF
Free/Free
|
Days
7 - 8
|
20' DRY
Free
|
40' / 40'hc / 45' DRY
Free
|
20' Flat & Open top
Free
|
40' Flat & Open top
Free |
20’ REEF / 40’ REEF
40/40
|
Days
9 - 14 |
20' DRY
20 |
40' / 40'hc / 45' DRY
20 |
20' Flat & Open top
20
|
40' Flat & Open top
20 |
20’ REEF / 40’ REEF
60/60
|
Days
15 onwards
|
20' DRY
40 |
40' / 40'hc / 45' DRY
64 |
20' Flat & Open top
60 |
40' Flat & Open top
96 |
20’ REEF / 40’ REEF
80/104
|
- Non-operating reefer (NOR) will be charged as DRY equipment.
- Reefer demurrage includes plug-in/electricity charges.
- Shippers’ own containers (SOC) are subject to demurrage applicable to the equipment size/type.
- The free time & charges applied will be those in place on the origin price calculation date (PCD).
- Cancelled (frustrated) exports will be subject to demurrage charges without free time.
Export Demurrage (Belfast only)
Demurrage (including equipment & storage) commences on and includes the day that the full container is gated-in at the first load port and ends on the planned arrival day of the vessel on which the container is shipped. If the container is not loaded by the carrier as intended the demurrage period will end on the planned arrival day of the vessel on which the container was booked to load.
Days | 20' DRY | 40' / 40'hc / 45' DRY | 20' Flat & Open top | 40' Flat & Open top | 20’ REEF / 40’ REEF |
---|---|---|---|---|---|
Days
1 - 6
|
20' DRY
Free
|
40' / 40'hc / 45' DRY
Free
|
20' Flat & Open top
Free
|
40' Flat & Open top
Free
|
20’ REEF / 40’ REEF
Free/Free
|
Days
7 - 10
|
20' DRY
Free
|
40' / 40'hc / 45' DRY
Free
|
20' Flat & Open top
Free
|
40' Flat & Open top
Free |
20’ REEF / 40’ REEF
40/40
|
Days
11 - 14 |
20' DRY
25 |
40' / 40'hc / 45' DRY
25 |
20' Flat & Open top
45
|
40' Flat & Open top
45 |
20’ REEF / 40’ REEF
65/65
|
Days
15 onwards
|
20' DRY
65 |
40' / 40'hc / 45' DRY
65
|
20' Flat & Open top
85 |
40' Flat & Open top
85 |
20’ REEF / 40’ REEF
105/105
|
- Non-operating reefer (NOR) will be charged as DRY equipment.
- Reefer demurrage includes plug-in/electricity charges.
- Shippers’ own containers (SOC) are subject to demurrage applicable to the equipment size/type.
- The free time & charges applied will be those in place on the origin price calculation date (PCD).
- Cancelled (frustrated) exports will be subject to demurrage charges without free time.
Country: United Kingdom (GB)
Direction: Export
Effective Date: 01/11/2022
Expiry Date: Until further notice
Free time: Calendar days (public holidays are counted as standard calendar days)
Currency: GBP
Invoiced: Per container, per calendar day, per container type
Application: The free time & charges applied will be those in place on the origin price calculation date (PCD)
Freetime: “Free Time” is the period agreed between the Carrier and the Merchant for which Demurrage and Detention shall not be paid by the Merchant.
Detention: Compensation payable when the Merchant holds Carrier's Container outside the port, terminal or depot beyond the agreed amount of Free Time.
Demurrage: Compensation payable when the Merchant holds Carrier’s Container inside the terminal, port or depot beyond the agreed amount of Free Time (the compensation includes terminal storage costs).
Name | Start | End |
---|---|---|
Name
Detention
|
Start
Commences on and includes the day that the empty container is gated out from the agreed terminal, port or depot.
|
End
Ends on the day that the full container is gated-in at the agreed terminal, port or depot.
|
Name
Demurrage
|
Start
Commences on and includes the day that the full container is gate-in at the first load port, subject to the gate-open/receiving window set by ports & terminals.
|
End
Ends on the pro-forma arrival day of the vessel that the full container is loaded on board for shipment.
|
Useful links:
- SPOT terms are those offered & accepted at the time the booking is confirmed and are not necessarily aligned with the standard tariff. Please click here for information about extending your destination free time. Tariff information may be found via Instant Price Search or during the booking process
- D&D Calculator (click here to know more about it)
- Detention and Demurrage Terms
Split - Demurrage includes Storage
Tariffs:
- Reefer demurrage includes plug-in/electricity charges
- Shipper's own containers (SOC) are subject to demurrage and not subject to detention
- Non-operating reefer (NOR) is considered as DRY container for demurrage and as REEFER for detention
- Cancelled/frustrated exports will incur demurrage & detention charges with no free time
Demurrage tariff at Felixstowe
Days | 20’ DRY | 40’ DRY / 40’ HC / 45’ DRY | 20’ Flat & Open top | 40’ Flat & Open top | 20’ REEF / 40’ REEF |
---|---|---|---|---|---|
Days
1 to 6
|
20’ DRY
free
|
40’ DRY / 40’ HC / 45’ DRY
free
|
20’ Flat & Open top
free
|
40’ Flat & Open top
free
|
20’ REEF / 40’ REEF
free
|
Days
7 to 8
|
20’ DRY
free
|
40’ DRY / 40’ HC / 45’ DRY
free
|
20’ Flat & Open top
free
|
40’ Flat & Open top
free
|
20’ REEF / 40’ REEF
45
|
Days
9 to 14
|
20’ DRY
20
|
40’ DRY / 40’ HC / 45’ DRY
30
|
20’ Flat & Open top
20
|
40’ Flat & Open top
30
|
20’ REEF / 40’ REEF
75
|
Days
15 onwards
|
20’ DRY
30
|
40’ DRY / 40’ HC / 45’ DRY
45
|
20’ Flat & Open top
30
|
40’ Flat & Open top
45
|
20’ REEF / 40’ REEF
90
|
Demurrage Tariff at Liverpool
Days | 20’ DRY (incl NOR) | 40’ DRY/HC (incl NOR) & 45’ DRY | 20’ Flat & Open top | 40’ Flat & Open top | 20’/40’ REEFER |
---|---|---|---|---|---|
Days
1 to 6
|
20’ DRY (incl NOR)
free
|
40’ DRY/HC (incl NOR) & 45’ DRY
free
|
20’ Flat & Open top
free
|
40’ Flat & Open top
free
|
20’/40’ REEFER
free
|
Days
7 only
|
20’ DRY (incl NOR)
free
|
40’ DRY/HC (incl NOR) & 45’ DRY
free
|
20’ Flat & Open top
free
|
40’ Flat & Open top
free
|
20’/40’ REEFER
95
|
Days
8 to 14
|
20’ DRY (incl NOR)
50
|
40’ DRY/HC (incl NOR) & 45’ DRY
100
|
20’ Flat & Open top
50
|
40’ Flat & Open top
100
|
20’/40’ REEFER
130
|
Days
15 onwards
|
20’ DRY (incl NOR)
60
|
40’ DRY/HC (incl NOR) & 45’ DRY
120
|
20’ Flat & Open top
60
|
40’ Flat & Open top
120
|
20’/40’ REEFER
150
|
Demurrage Tariff at Teesport
Days | 20’ DRY (incl NOR) | 40’ DRY/HC (incl NOR) & 45’ DRY | 20’ Flat & Open top | 40’ Flat & Open top | 20’/40’ REEFER |
---|---|---|---|---|---|
Days
1 to 4
|
20’ DRY (incl NOR)
free
|
40’ DRY/HC (incl NOR) & 45’ DRY
free
|
20’ Flat & Open top
free
|
40’ Flat & Open top
-free
|
20’/40’ REEFER
free
|
Days
5 to 14
|
20’ DRY (incl NOR)
24
|
40’ DRY/HC (incl NOR) & 45’ DRY
36
|
20’ Flat & Open top
24
|
40’ Flat & Open top
36
|
20’/40’ REEFER
95
|
Days
15 onwards
|
20’ DRY (incl NOR)
60
|
40’ DRY/HC (incl NOR) & 45’ DRY
90
|
20’ Flat & Open top
60
|
40’ Flat & Open top
90
|
20’/40’ REEFER
150
|
Demurrage tariff at Grangemouth
Days | 20’ DRY | 40’ DRY / 40’ HC / 45’ DRY | 20’ Flat & Open top | 40’ Flat & Open top | 20’ REEF / 40’ REEF |
---|---|---|---|---|---|
Days
1 to 6
|
20’ DRY
free
|
40’ DRY / 40’ HC / 45’ DRY
free
|
20’ Flat & Open top
free
|
40’ Flat & Open top
free
|
20’ REEF / 40’ REEF
free
|
Days
7 to 10
|
20’ DRY
free
|
40’ DRY / 40’ HC / 45’ DRY
free
|
20’ Flat & Open top
free
|
40’ Flat & Open top
free
|
20’ REEF / 40’ REEF
45
|
Days
11 to 14
|
20’ DRY
15
|
40’ DRY / 40’ HC / 45’ DRY
30
|
20’ Flat & Open top
15
|
40’ Flat & Open top
30
|
20’ REEF / 40’ REEF
75
|
Days
15 onwards
|
20’ DRY
20
|
40’ DRY / 40’ HC / 45’ DRY
40
|
20’ Flat & Open top
20
|
40’ Flat & Open top
40
|
20’ REEF / 40’ REEF
85
|
Demurrage tariff at Belfast
Days | 20’ DRY | 40’ DRY / 40’ HC / 45’ DRY | 20’ Flat & Open top | 40’ Flat & Open top | 20’ REEF / 40’ REEF |
---|---|---|---|---|---|
Days
1 to 6
|
20’ DRY
free
|
40’ DRY / 40’ HC / 45’ DRY
free
|
20’ Flat & Open top
free
|
40’ Flat & Open top
free
|
20’ REEF / 40’ REEF
free
|
Days
7 to 10
|
20’ DRY
free
|
40’ DRY / 40’ HC / 45’ DRY
free
|
20’ Flat & Open top
free
|
40’ Flat & Open top
free
|
20’ REEF / 40’ REEF
80
|
Days
11 to 14
|
20’ DRY
35
|
40’ DRY / 40’ HC / 45’ DRY
35
|
20’ Flat & Open top
35
|
40’ Flat & Open top
35
|
20’ REEF / 40’ REEF
115
|
Days
15 onwards
|
20’ DRY
60
|
40’ DRY / 40’ HC / 45’ DRY
60
|
20’ Flat & Open top
60
|
40’ Flat & Open top
60
|
20’ REEF / 40’ REEF
140
|
Demurrage tariff at London Gateway, Southampton, South Shields & Hull
Days | 20’ DRY | 40’ DRY / 40’ HC / 45’ DRY | 20’ Flat & Open top | 40’ Flat & Open top | 20’ REEF / 40’ REEF |
---|---|---|---|---|---|
Days
1 to 6
|
20’ DRY
free
|
40’ DRY / 40’ HC / 45’ DRY
free
|
20’ Flat & Open top
free
|
40’ Flat & Open top
free
|
20’ REEF / 40’ REEF
free
|
Days
7 only
|
20’ DRY
free
|
40’ DRY / 40’ HC / 45’ DRY
free
|
20’ Flat & Open top
free
|
40’ Flat & Open top
free
|
20’ REEF / 40’ REEF
70
|
Days
8 to 14
|
20’ DRY
30
|
40’ DRY / 40’ HC / 45’ DRY
50
|
20’ Flat & Open top
30
|
40’ Flat & Open top
50
|
20’ REEF / 40’ REEF
85
|
Days
15 onwards
|
20’ DRY
40
|
40’ DRY / 40’ HC / 45’ DRY
60
|
20’ Flat & Open top
40
|
40’ Flat & Open top
60
|
20’ REEF / 40’ REEF
110
|
Detention Tariff at all UK ports including Belfast
Days | 20’ DRY | 40’ / 40’hc / 45’ DRY | 20’ Flat & Open top | 40’ Flat & Open top | 20’ REEF / 40’ REEF |
---|---|---|---|---|---|
Days
1 to 7
|
20’ DRY
free
|
40’ / 40’hc / 45’ DRY
free
|
20’ Flat & Open top
free
|
40’ Flat & Open top
free
|
20’ REEF / 40’ REEF
free
|
Days
8 to 14
|
20’ DRY
35
|
40’ / 40’hc / 45’ DRY
50
|
20’ Flat & Open top
95
|
40’ Flat & Open top
95
|
20’ REEF / 40’ REEF
95
|
Days
15 onwards
|
20’ DRY
55
|
40’ / 40’hc / 45’ DRY
80
|
20’ Flat & Open top
125
|
40’ Flat & Open top
125
|
20’ REEF / 40’ REEF
125
|
Haulage availability
You can easily check our haulage availability here.
If you do need to amend or cancel your booking with us, please let us know by 12.00 PM two working days prior to your booked collection (excludes weekends). This enables us to avoid any unnecessary wasted journey charges being passed onto you and provides our drivers the best opportunity to get your cargo where it needs to be.
Max. road limitation
44,000 kgs (combined weight of truck, chassis, container & cargo cannot exceed 44000kgs). Legal road limit is 26,000 kgs gross cargo weight for a 40ft Dry unit and 27,000 kgs for a 20ft Dry unit.
Special cargoes
OOG, B/B & IMO cargo subject to our standard Sealand approval procedures.