Shipping in Romania

Get up-to-date local information about export procedures and restrictions, demurrage and detention, container drop-offs and more.

Restrictions

Equipment and weight / measurements – No Out of guage (OOG) or reefer cargo is accepted by rail.

Procedures

Deadlines – could be found under Services and cut-off times section.
Inland haulage for reefer containers - Carrier Haulage for reefer containers is acceptable subject to GENSET equipment availability and always Genset Surcharge (GEN) for minimum 2 calendar days must apply in line with the local charges valid at the date of shipment.
Destination countries or local locations - If rates for a desired location could not be retrieved in Erates, please contact Sales Department.
Hazardous cargoes ; Erates do not cover trucking and rail tariffs for Dangerous cargo (IMO). Please contact Sales Department at which will quote accordingly.
Special cargoes - Out of guage cargoes (OOG), Break-bulk cargoes and Dangerous cargoes (IMO) are subject to standard Seago Line approval procedures.

Demurrage and Detention

Moving forward our pricing structure in Bulgaria will consist of two elements; Storage and Combined Demurrage & Detention. This means you will have one combined free time period and charges for utilisation of equipment inside and outside of terminals or depots, referred to as Combined Demurrage & Detention. Storage fees for use of terminal or depot space will be charged separately.
You will see these charges specified on your invoices during 2016 as Export Storage and Export Combined Demurrage & Detention.
Effective 01/01/2016 our tariff charges will be:

Demurrage and Detention Combined Export

 

TRUCK (Days) 20 DRY (USD) 40 DRY/HDRY (USD) 45 HDRY (USD) 20 OT (USD) 40 OT/FR (USD)
0-14 0 0 0 0 0
15-21 40 80 160 80 160
22-28 50 100 200 100 200
>29 60 120 240 120 240

 

BARGE (Days) 20 DRY (USD) 40 DRY/HDRY (USD) 45 HDRY (USD) 20 OT (USD) 40 OT/FR (USD)
0-21 0 0 0 0 0
22-28 50 100 200 100 200
>29 60 120 240 120 240

 

RAIL (Days) 20 DRY (USD) 40 DRY/HDRY (USD) 45 HDRY (USD) 20 OT (USD) 40 OT/FR (USD)
0-28 0 0 0 0 0
>29 60 120 240 120 240

 

ALL (Days) 20 REEF (USD) 40 REEF/HREEF (USD)
0-10 0 0
11 15 150 150
>16 250 250

 

Separation of Storage

To increase transparency in our charges, we will separate Storage from Demurrage.
This allows a clear distinction of the charges applied for use of space in terminals or depots (Storage), and the cost incurred for utilising equipment beyond the agreed free time days inside terminals or depots (Demurrage).
Storage is charged for utilisation of terminal, port, depot, or inland container yard facilities.

 

Storage Export 

TYPE 0-10 DAYS 11-15 DAYS 16-30 DAYS >31 DAYS
20 DRY 0 10 15 25
40 DRY/HDRY 0 20 30 50
45 HDRY 0 20 30 50
20 OT 0 10 15 25
40 OT/FR 0 20 30 50
20 REEF, >1 DAYS 75
40 REEF, >1 DAYS 75

Email your local office

If you want to speak to a sales person about a new shipment or have a question about your existing shipment, you can email us. If you have a more immediate question, you can search for help online or contact us by phone.