Sealand Maersk’s Ireland export D&D tariffs will be revised for shipments with an origin price calculation date (PCD) on or after 1st November 2021. Please note that free time is in calendar days and charges thereafter are in EUR, applicable per container per calendar day.
Export detention
Equipment detention commences on and includes the day that the empty container is collected and ends on the day that the full container is gated-in at the first load port.
Dublin & Cork
Days | 20’ DRY |
40’ DRY 40’ HC & 45’ DRY |
20’ Flat & Open top | 40’ Flat & Open top | 20’ REEF / 40’ REEF |
---|---|---|---|---|---|
Days
1 to 7
|
20’ DRY
free
|
40’ DRY 40’ HC & 45’ DRY
free
|
20’ Flat & Open top
free
|
40’ Flat & Open top
free
|
20’ REEF / 40’ REEF
free / free
|
Days
8 to 14
|
20’ DRY
15
|
40’ DRY 40’ HC & 45’ DRY
24
|
20’ Flat & Open top
35
|
40’ Flat & Open top
56
|
20’ REEF / 40’ REEF
75 / 84
|
Days
15 onwards
|
20’ DRY
30
|
40’ DRY 40’ HC & 45’ DRY
48
|
20’ Flat & Open top
50
|
40’ Flat & Open top
80
|
20’ REEF / 40’ REEF
90 / 108
|
Non-operating reefer (NOR) will be charged as REEFER equipment
Shippers’ own containers (SOC) will not be subject to equipment detention charges
The free time & charges applied will be those in place on the origin price calculation date (PCD) Cancelled (frustrated) exports will be subject to detention charges without free time
Export Demurrage
Demurrage (including equipment & storage) commences on and includes the day that the full container is gated-in at the first load port and ends on the planned arrival day of the vessel on which the container is shipped. If the container is not loaded by the carrier as intended the demurrage period will end on the planned arrival day of the vessel on which the container was booked to load.
Dublin & Cork
Days | 20’ DRY |
40’ DRY 40’ HC & 45’ DRY |
20’ Flat & Open top | 40’ Flat & Open top | 20’ REEF / 40’ REEF |
---|---|---|---|---|---|
Days
1 to 7
|
20’ DRY
free
|
40’ DRY 40’ HC & 45’ DRY
free
|
20’ Flat & Open top
free
|
40’ Flat & Open top
free
|
20’ REEF / 40’ REEF
free / free
|
Days
8 to 14
|
20’ DRY
free
|
40’ DRY 40’ HC & 45’ DRY
free
|
20’ Flat & Open top
free
|
40’ Flat & Open top
free
|
20’ REEF / 40’ REEF
65 / 65 |
Days
11 to 28
|
20’ DRY
16
|
40’ DRY 40’ HC & 45’ DRY
32
|
20’ Flat & Open top
16
|
40’ Flat & Open top
32
|
20’ REEF / 40’ REEF
81 / 97 |
Days
29 onwards
|
20’ DRY
28
|
40’ DRY 40’ HC & 45’ DRY
56
|
20’ Flat & Open top
28
|
40’ Flat & Open top
56
|
20’ REEF / 40’ REEF
93 / 121 |
Non-operating reefer (NOR) will be charged as DRY equipment
Reefer demurrage includes plug-in/electricity charges
Shippers’ own containers (SOC) are subject to demurrage applicable to the equipment size/type
The free time & charges applied will be those in place on the origin price calculation date (PCD) Cancelled (frustrated) exports will be subject to demurrage charges without free time
If you have any questions, please reach out to your local sales or customer experience representative.
We want to thank you for your business and look forward to continuously serving your global transportation needs.